REVISED TARIFFS FOR SEJINGKAT TERMINAL EFFECTIVE 1ST MARCH 2015

No
Tariff Description
Unit
Chargeable Unit
Rates (RM)
Billing Party
Remarks
1
 
 
 
 
 
 
Wharfage Charge
 
Any vessel calling at Sejingkat Terminal
Shall be charged a Wharfage Charge
Collectable on behalf of Sarawak River
Board (SRB) for the usage of wharf's
facility
 
 
Revenue Tonnage
 
 
 
 
 
 
<= 50 RT
51 - 100 RT
101 - 200 RT
>300 RT
 
 
Day 1
Day 2
Subsequent Days
10.00
15.00
25.00
15.00
25.00
35.00
25.00
40.00
55.00
55.00
75.00
100.00
70.00
90.00
120.00
 
 
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
 
2
 
a)
 
 
 
 
 
 
 
 
b)
 
 
 
 
 
 
 
c)
 
 
 
 
Terminal Operating Charge (TOC)
 
Containerize (Usage of Wharf
Crane)
A vessel Carrying Containerized
cargos activity for loading or
discharging using Terminal Wharf
Crane shall be charged a TOC
for the services provided by the
terminal
 
Containerize (Without Wharf
Crane)
A vessel carrying containerized cargos
with activity for loading or dischargimg
using Own Ship Derick only shall be
charged a TOC for the services
provided by the terminal.
 
Non Containerize (Losse cargo)
A vessel with activity for loading
& discharging shall be charged a TOC
for the services provided by the
terminal
 
 
 
 
Teu
 
 
 
 
 
 
 
 
 
Teu
 
 
 
 
 
 
Revenue Tonnage (RT)
/ Cubic Meter (CBM)
 
 
 
 
 
Per lift Per Unit
 
 
 
 
 
 
 
 
 
Per lift Per Unit
 
 
 
 
 
 
Per RT or CBM;
whichever is
higher
     
     
     
Laden
Empty
20'
132.00
66.00
40'
265.00
132.00
     
     
     
     
     
     
     
Laden
Empty
20'
66.00
33.00
40'
133.00
66.00
     
     
     
     
     
     
     
     
 
 
 
 
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
     
     
     
     
     
 
 
 
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
     
     
     
     
     
     
     
     
 
 
 
 
Not inclusive of mooring,
floodlights and overtime
charges
 
 
 
 
 
 
 
Not inclusive mooring,
floodlight and overtime
charges
 
 
 
 
 
 
 
3
 
a)
 
 
 
 
 
 
 
 
b)
 
 
 
 
 
 
Vessel Berthing / Docking Charge:
 
Berthing for Freshwater & Bunker
only
A vessel carrying coastal cargos
without activity for loading &
discharging but require, bunkering or
fresh water supply within Sarawak
only. Shall be charge with Berth
docking fee
 
Berthing for Repairs Only
 
Any vessel requires docking facility
at sejingkat Terminal for repair or
maintenance (non-cargo operation)
shall be charged a Vessel Docking
Charge for the usage of wharf's facility
 
 
 
 
 
 
 
Length Overall of
Vessel (LOA)
measured in meter
Length Overall of Vessel
(LOA) measured in
Meter Length (M)
 
 
 
 
 
 
 
 
 
< 20 M
20 - 60 M
>60
 
 
 
< 40 M
40 - 60 M
60 - 80 M
> 80 M
 
     
     
     
     
First 20 Meters
Next 210 - 60
Subsequent
Part Thereoff
Meters Per
Meters Per Meter
Per Hour
Meter Per Hour
Per Hour
20.00
-
-
35.00
1.00
-
35.00
1.00
2.00
     
     
     
Per Day or Part Thereof
 
50.00
 
 
100.00
 
 
200.00
 
 
300.00
 
 
 
 
 
 
 
 
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
 
 
 
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
 
 
 
 
 
 
 
 
Not inclusive mooning
floodlight and overtime
changes
 
 
 
Not inclusive mooning
floodlight and overtime
changes
 
 
4
 
 
 
 
Fresh Water Supply
 
For the service and supply of fresh
water to any vessel shall be charged
a Fresh Water Supply Charge
 
 
Liter (L)
 
 
 
 
Per 1, 000 L
 
 
 
 
RM 3.00 / 1,000 L
 
 
 
 
Vessel Operator/ Shipping Agent
 
 
 
 
 
 
 
5
 
 
 
 
Mooring Charge
 
To provide the services and facility
to secure vessel's mooring at the wharf
of Sejingkat Terminal
 
Length Overall of
Vessel (LOA)
measured in Meter
 
 
< 120
>120
 
 
Per Vessel Call
200.00
300.00
 
 
 
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
 
 
 
 
 
 
6
 
 
 
 
 
Floodlight Charge:
 
To provide sufficient lightings to
facilitate the operation beyond normal
woriking hours at the wharf, yard or
warehouse
 
Floodlight (FL) / High-
Mast (HM)
 
 
 
 
Per Unit of FL
/ HM
 
 
 
 
RM 10.00 / unit/ hour + RM20.00 service charge
 
 
 
 
 
Vessel Operator/ Shipping Agent
 
 
 
 
 
 
 
 
 
7
 
 
 
 
 
Overtime Charge
 
To provide sufficient manpower to
facilitate the operation beyond the
normal working hour of Sejingkat
Terminal
 
 
1 gang comprises of 1
operation clerk & 1
security guard
 
 
 
 
1 Gang Per Shift
 
 
     
Time
Mon - Sat
Sun & PH
0700 - 1700 hrs
-
300.00
1700 - 0000 hrs
200.00
300.00
0000 - 0700 hrs
200.00
300.00
     
 
 
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
Vessel Operator/ Shipping Agent
 
 
 
 
 
 
 
8
 
 
a)
 
 
 
 
 
 
 
 
b)
 
 
 
 
Storage Charge / Rental
 
Short Term
Any indirect handling of conventional
that require temporary storage for a
period les than 1 month shall be
charged a Storage Charge for the
useage of covered warehouese or
open yard
 
 
Long Term
Any indirect handling of conventional
cargos that require mid-to-long term
storage for a period more than 1 month
shall be charged a Rental for the usage
of covered warehouse or open yard
 
 
 
Revenue Tonnage (TR)
/ Cubic Meter (CBM)
 
 
 
 
 
 
 
 
Square Feet (SQFT)
 
 
 
 
 
 
Per RT or CBM;
whichever is
higher
 
 
 
 
 
 
 
Per SQT
 
 
 
     
     
Covered Warehouse Per Week or Part Thereoff
Week 1
week 2
Subsequent Week
4.00
6.00
8.00
(3 days free)
Open Yard Per Week or Part Thereoff
Week 1
Week 2
Subsequent Week
2.00
3.00
4.00
(3 days free)
     
Covered Warehouse Per month or Part Thereoff
< 3 Months
4 - 6 Monthd
> 6 Months
1.80
1.50
1.20
Covered Warehouse Per month or Part Thereoff
< 3Months
4 -6 Months
> 6 Months
1.20
1.00
0.80
 
 
 
 
Shipper / Consignee
 
 
 
Shipper / Consignee
 
 
 
 
Shipper / Consignee
 
 
Shipper / Consignee
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
9
 
 
 
 
 
 
 
 
 
Terminal Cleaning service Charge:
 
Vessel Operator or shipping agent is
responsible to clean the wharf and
terminal's compound within 48 hours
upon operation completion. Failure to
do so , Sejingkat Terminal will perform
the necessary cleaning and charge to
the vessel operator or shipping agent
a Terminal Cleaning Service Charge
 
 
 
 
Per Job
 
 
 
 
 
 
 
 
 
Per Job
 
 
 
 
 
 
 
 
 
RM 1,000.00 / job
 
 
 
 
 
 
 
 
 
Vessel Operator/ Shipping Agent
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
10
 
a)
 
 
 
 
b)
 
 
 
 
c)
 
 
 
 
Container Charges:
 
Container Lifting Charge (RSND)
To provide lifting service of container
using a Reach Stacker from the ground
onto the trailer or vice versa
 
Container Drayage Charge
To provide internal drayage service of
conatiner using a Terminal tractor from
wharf to yard or vice versa
 
Conatiner Storage Charge
For the usage of open yard as storage
for container shall be charged a
Container shall be charged a container
Storage charge
 
 
 
Per Lift Per Unit
 
 
 
 
Per trip Per Unit
 
 
 
 
 
Per Unit Per Day
 
 
 
 
 
Per Lift Per Unit
 
 
 
 
Per trip Per Unit
 
 
 
 
 
20'
40'
 
     
     
Laden
Empty
20'
65.00
35.00
40'
100.00
70.00
     
     
Laden
Empty
20'
30.00
20.00
40'
60.00
40.00
     
     
Day 1 - 4
Sebsequent Day
Laden / MT
Laden
Empty
Free
12.00
6.00
Free
24.00
12.00
     
 
 
 
Box Opr / Shipper / Consignee
Box Opr / Shipper / Consignee
 
 
 
Box Opr / Shipper / Consignee
Box Opr / Shipper / Consignee
 
 
 
 
Box Opr / Shipper / Consignee
Box Opr / Shipper / Consignee
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
11
 
 
 
 
a)
 
 
 
 
b)
 
 
 
 
 
 
 
c)
 
 
d)
 
Charges for Hire or Use of Equipement
The hire of the equipment shall be on basis of availability thereof only and nothing herein shall be constructed to require or bind Sejingkat Terminal to make available any of its equipment to any person.
The charges shall include the cost operating and using the equipment and shall be at the following rates:
 
Crane
 
 
 
 
Forklift
 
 
 
 
 
 
 
Towing Tractor
 
 
Container
 
 
Per Unit
 
 
 
 
Per Unit
 
 
 
 
 
 
 
Per Unit
 
 
Per Unit
 
 
Hours
 
 
 
 
Hours
 
 
 
 
 
 
 
Hours
 
 
Hours
 
Crane Capacity
Charges per hour or part thereof
I) Up tp 35 Tons
RM 80.00
II) 45 Tons
RM 90.00
III) 50 Tons
RM 100.00
IV) Above 50 Tons
Rate on Demand
   
Forklift Capacity
Charges per hour or part thereof
3 Tons
RM 35.00
4 Tons
RM 50.00
6 Tons
RM 75.00
8 Tons
RM 90.00
10 Tons
RM 100.00
   
Tractor Capacity
Charges per hour or part thereof
50 Tons
RM 35.00
   
Trailer Capacity
Charges per hour or part thereof
I) 20 footer
RM 50.00
II) 40 - 45 footer
RM 75.00