|
Wharfage Charge |
|
Any vessel calling at Sejingkat Terminal |
Shall be charged a Wharfage Charge |
Collectable on behalf of Sarawak River |
Board (SRB) for the usage of wharf's |
facility |
|
|
|
|
<= 50 RT |
51 - 100 RT |
101 - 200 RT |
>300 RT
|
|
|
|
Day 1 |
Day 2 |
Subsequent Days |
10.00 |
15.00 |
25.00 |
15.00 |
25.00 |
35.00 |
25.00 |
40.00 |
55.00 |
55.00 |
75.00 |
100.00 |
70.00 |
90.00 |
120.00 |
|
|
|
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
|
|
|
Terminal Operating Charge (TOC) |
|
Containerize (Usage of Wharf |
Crane) |
A vessel Carrying Containerized |
cargos activity for loading or |
discharging using Terminal Wharf |
Crane shall be charged a TOC |
for the services provided by the |
terminal |
|
Containerize (Without Wharf |
Crane) |
A vessel carrying containerized cargos |
with activity for loading or dischargimg |
using Own Ship Derick only shall be |
charged a TOC for the services |
provided by the terminal. |
|
Non Containerize (Losse cargo) |
A vessel with activity for loading |
& discharging shall be charged a TOC |
for the services provided by the |
terminal |
|
|
|
|
|
Teu |
|
|
|
|
|
|
|
|
|
Teu |
|
|
|
|
|
|
Revenue Tonnage (RT) |
/ Cubic Meter (CBM) |
|
|
|
|
|
|
Per lift Per Unit |
|
|
|
|
|
|
|
|
|
Per lift Per Unit |
|
|
|
|
|
|
Per RT or CBM; |
whichever is |
higher |
|
|
|
|
|
|
|
|
|
|
|
Laden |
Empty |
20' |
132.00 |
66.00 |
40' |
265.00 |
132.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Laden |
Empty |
20' |
66.00 |
33.00 |
40' |
133.00 |
66.00 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Not inclusive of mooring, |
floodlights and overtime |
charges |
|
|
|
|
|
|
|
Not inclusive mooring, |
floodlight and overtime |
charges |
|
|
|
|
|
|
|
|
|
Vessel Berthing / Docking Charge: |
|
Berthing for Freshwater & Bunker |
only |
A vessel carrying coastal cargos |
without activity for loading & |
discharging but require, bunkering or |
fresh water supply within Sarawak |
only. Shall be charge with Berth |
docking fee |
|
Berthing for Repairs Only |
|
Any vessel requires docking facility |
at sejingkat Terminal for repair or |
maintenance (non-cargo operation) |
shall be charged a Vessel Docking |
Charge for the usage of wharf's facility |
|
|
|
|
|
|
|
|
Length Overall of |
Vessel (LOA) |
measured in meter |
|
|
|
Length Overall of Vessel |
(LOA) measured in |
Meter Length (M) |
|
|
|
|
|
|
|
|
|
|
< 20 M |
20 - 60 M |
>60 |
|
|
|
< 40 M |
40 - 60 M |
60 - 80 M |
> 80 M |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
First 20 Meters |
Next 210 - 60 |
Subsequent |
Part Thereoff |
Meters Per |
Meters Per Meter |
Per Hour |
Meter Per Hour |
Per Hour |
20.00 |
- |
- |
35.00 |
1.00 |
- |
35.00 |
1.00 |
2.00 |
|
|
|
|
|
|
|
|
|
Per Day or Part Thereof |
|
50.00 |
|
|
100.00 |
|
|
200.00 |
|
|
300.00 |
|
|
|
|
|
|
|
|
|
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
|
|
|
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
|
|
|
|
|
|
|
|
|
Not inclusive mooning |
floodlight and overtime |
changes |
|
|
|
Not inclusive mooning |
floodlight and overtime |
changes |
|
|
|
|
Fresh Water Supply |
|
For the service and supply of fresh |
water to any vessel shall be charged |
a Fresh Water Supply Charge |
|
|
|
|
|
|
Vessel Operator/ Shipping Agent |
|
|
|
|
|
Mooring Charge |
|
To provide the services and facility |
to secure vessel's mooring at the wharf |
of Sejingkat Terminal |
|
|
|
Length Overall of |
Vessel (LOA) |
measured in Meter |
|
|
|
Per Vessel Call |
200.00 |
300.00 |
|
|
|
|
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
|
|
|
|
Floodlight Charge: |
|
To provide sufficient lightings to |
facilitate the operation beyond normal |
woriking hours at the wharf, yard or |
warehouse |
|
|
|
Floodlight (FL) / High- |
Mast (HM) |
|
|
|
|
|
|
RM 10.00 / unit/ hour + RM20.00 service charge |
|
|
|
|
|
|
Vessel Operator/ Shipping Agent |
|
|
|
|
|
|
Overtime Charge |
|
To provide sufficient manpower to |
facilitate the operation beyond the |
normal working hour of Sejingkat |
Terminal |
|
|
|
1 gang comprises of 1 |
operation clerk & 1 |
security guard |
|
|
|
|
|
|
Time |
Mon - Sat |
Sun & PH |
0700 - 1700 hrs |
- |
300.00 |
1700 - 0000 hrs |
200.00 |
300.00 |
0000 - 0700 hrs |
200.00 |
300.00 |
|
|
|
|
|
|
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
Vessel Operator/ Shipping Agent |
|
|
|
|
Storage Charge / Rental |
|
Short Term |
Any indirect handling of conventional |
that require temporary storage for a |
period les than 1 month shall be |
charged a Storage Charge for the |
useage of covered warehouese or |
open yard |
|
|
Long Term |
Any indirect handling of conventional |
cargos that require mid-to-long term |
storage for a period more than 1 month |
shall be charged a Rental for the usage |
of covered warehouse or open yard |
|
|
|
|
Revenue Tonnage (TR) |
/ Cubic Meter (CBM) |
|
|
|
|
|
|
|
|
Square Feet (SQFT) |
|
|
|
|
|
|
|
Per RT or CBM; |
whichever is |
higher |
|
|
|
|
|
|
|
Per SQT |
|
|
|
|
|
|
|
|
|
|
Covered Warehouse Per Week or Part Thereoff |
Week 1 |
week 2 |
Subsequent Week |
4.00 |
6.00 |
8.00 |
(3 days free) |
|
|
Open Yard Per Week or Part Thereoff |
Week 1 |
Week 2 |
Subsequent Week |
2.00 |
3.00 |
4.00 |
(3 days free) |
|
|
|
|
|
Covered Warehouse Per month or Part Thereoff |
< 3 Months |
4 - 6 Monthd |
> 6 Months |
1.80 |
1.50 |
1.20 |
Covered Warehouse Per month or Part Thereoff |
< 3Months |
4 -6 Months |
> 6 Months |
1.20 |
1.00 |
0.80 |
|
|
|
|
|
Shipper / Consignee |
|
|
|
Shipper / Consignee |
|
|
|
|
Shipper / Consignee |
|
|
Shipper / Consignee |
|
|
|
Terminal Cleaning service Charge: |
|
Vessel Operator or shipping agent is |
responsible to clean the wharf and |
terminal's compound within 48 hours |
upon operation completion. Failure to |
do so , Sejingkat Terminal will perform |
the necessary cleaning and charge to |
the vessel operator or shipping agent |
a Terminal Cleaning Service Charge |
|
|
|
|
|
|
|
|
Vessel Operator/ Shipping Agent |
|
|
|
|
|
|
|
|
Container Charges: |
|
Container Lifting Charge (RSND) |
To provide lifting service of container |
using a Reach Stacker from the ground |
onto the trailer or vice versa |
|
Container Drayage Charge |
To provide internal drayage service of |
conatiner using a Terminal tractor from |
wharf to yard or vice versa |
|
Conatiner Storage Charge |
For the usage of open yard as storage |
for container shall be charged a |
Container shall be charged a container |
Storage charge |
|
|
|
|
Per Lift Per Unit |
|
|
|
|
Per trip Per Unit |
|
|
|
|
|
Per Unit Per Day |
|
|
|
|
|
|
Per Lift Per Unit |
|
|
|
|
Per trip Per Unit |
|
|
|
|
|
20' |
40' |
|
|
|
|
|
|
|
|
|
Laden |
Empty |
20' |
65.00 |
35.00 |
40' |
100.00 |
70.00 |
|
|
|
|
|
|
|
Laden |
Empty |
20' |
30.00 |
20.00 |
40' |
60.00 |
40.00 |
|
|
|
|
|
|
Day 1 - 4 |
Sebsequent Day |
Laden / MT |
Laden |
Empty |
Free |
12.00 |
6.00 |
Free |
24.00 |
12.00 |
|
|
|
|
|
|
|
Box Opr / Shipper / Consignee |
Box Opr / Shipper / Consignee |
|
|
|
Box Opr / Shipper / Consignee |
Box Opr / Shipper / Consignee |
|
|
|
|
Box Opr / Shipper / Consignee |
Box Opr / Shipper / Consignee |
|
|
|
|
Charges for Hire or Use of Equipement |
The hire of the equipment shall be on basis of availability thereof only and nothing herein shall be constructed to require or bind Sejingkat Terminal to make available any of its equipment to any person. |
The charges
shall include the cost operating and using the equipment and shall be at the following rates: |
|
|
Crane |
|
|
|
|
Forklift |
|
|
|
|
|
|
|
Towing Tractor |
|
|
Container |
|
|
|
Per Unit |
|
|
|
|
Per Unit |
|
|
|
|
|
|
|
Per Unit |
|
|
Per Unit |
|
|
|
Crane Capacity |
Charges per hour or part thereof |
I) Up tp 35 Tons |
RM 80.00 |
II) 45 Tons |
RM 90.00 |
III) 50 Tons |
RM 100.00 |
IV) Above 50 Tons |
Rate on Demand |
|
|
Forklift Capacity |
Charges per hour or part thereof |
3 Tons |
RM 35.00 |
4 Tons |
RM 50.00 |
6 Tons |
RM 75.00 |
8 Tons |
RM 90.00 |
10 Tons |
RM 100.00 |
|
|
Tractor Capacity |
Charges per hour or part thereof |
50 Tons |
RM 35.00 |
|
|
Trailer Capacity |
Charges per hour or part thereof |
I) 20 footer |
RM 50.00 |
II) 40 - 45 footer |
RM 75.00 |
|
|
|